ISSN 2096-4498

   CN 44-1745/U

二维码
Countermeasures for Failure of Shield Receiving of Xiqingdao StationNanyunhe Station Section on Line No. 6 of Tianjin Metro
LI Hai, ZHU Changsong
Tunnel Construction . 2016, (12): 1512 -1516 .  DOI: 10.3973/j.issn.1672-741X.2016.12.016