ISSN 2096-4498

   CN 44-1745/U

二维码
Analysis of Drainage Capacity of Tunnel Bored by TBM during Construction Period
FANG Dunmin, XIONG Baofeng, PAN Yibin
Tunnel Construction . 2017, (8): 980 -984 .  DOI: 10.3973/j.issn.1672-741X.2017.08.010