ISSN 2096-4498

   CN 44-1745/U

二维码
Analysis of Key Technological Improvement in Construction of  Metro Station by CutandCover TopDown Method
YANG Xianghua, LEI Bo, HUANG Zhe
Tunnel Construction . 2018, (4): 649 -655 .  DOI: 10.3973/j.issn.2096-4498.2018.04.016