ISSN 2096-4498

   CN 44-1745/U

二维码
Risk Assessment and Response to Bidding for Island and Tunnel DesignConstruction Contracting of Hong KongZhuhaiMacao Bridge Project
DAI Jianbiao, GAO Xinglin, ZHANG Minggong
Tunnel Construction . 2018, (7): 1138 -1148 .  DOI: 10.3973/j.issn.2096-4498.2018.07.009