ISSN 2096-4498

   CN 44-1745/U

二维码
Optimization of Construction Method for Trilane Tunnel under Complex Geological Conditions
MA Dong
Tunnel Construction . 2018, (S2): 253 -260 .  DOI: 10.3973/j.issn.2096-4498.2018.S2.034