ISSN 2096-4498

   CN 44-1745/U

二维码
Ground Pretreatment Method for Deep Soft Soil of Metro Shield Tunnel in Foshan
ZHU Jianfeng
Tunnel Construction . 2019, (8): 1326 -1333 .  DOI: 10.3973/j.issn.2096-4498.2019.08.014