ISSN 2096-4498

   CN 44-1745/U

二维码
Key Technologies for Design and Construction of Metro Station by Pipe-roof PBA Method
LI Tiesheng
Tunnel Construction . 2020, (4): 531 -537 .  DOI: 10.3973/j.issn.2096-4498.2020.04.009