Optimization Design of Reinforcement Range When a Metro Shield Tunnel Crossing underneath an Existing Railway Tunnel: a Case Study on Nanning Metro Line 4 Crossing underneath Existing Chalu Tunnel
ISSN 2096-4498
CN 44-1745/U