Transformation, Assembling and Construction Technology of Open Pipe Jacking Machine to Slurry Balanced Pipe Jacking Machine in Tunnel:
a Case Study on Shenzhen 110 kV Overhead Line Transformation into Ground Cable Tunnel Project
ISSN 2096-4498
CN 44-1745/U