ISSN 2096-4498

   CN 44-1745/U

二维码

Feasibility Study on Direct Cutting of Reinforced Concrete Pile Foundation with ϕ25 mm Main Reinforced Bar by Shield

LI Hongbo
Tunnel Construction . 2020, (12): 1808 -1816 .  DOI: 10.3973/j.issn.2096-4498.2020.12.016