ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Assembled Technology of Top Air Duct of a Metro Station:
a Case Study on Phase 1 Project of Beijing Metro Line No. 19
SU Liyong, LU Qingquan, ZHANG Zhiwei, XU Yang, REN Yuhong, ZHOU Yi
Tunnel Construction . 2021, (
5
): 814 -821 . DOI: 10.3973/j.issn.2096-4498.2021.05.015