ISSN 2096-4498

   CN 44-1745/U

二维码

Investigation of Prefabricated Invert Used in Shergyla Mountain Tunnel of Sichuan-Tibet Railway

LIU Jianhong, LI Guoliang, WANG Fei, ZHAO Xiaoyong, LIU Xiaogang, CUI Runbing
Tunnel Construction . 0, (): 1290 - .  DOI: 10.3973/j.issn.2096-4498.2021.08.003