ISSN 2096-4498

   CN 44-1745/U

二维码
Prediction of Surface Settlement in Construction Stage of Earth Pressure Balance Shield Tunnel Based on Differential Evolution AlgorithmSupport Vector Regression Machine
BAI Xiangrui, RONG Xiaoli, WEN Zhu, ZHANG Ning
Tunnel Construction . 2021, (S2): 336 -345 .  DOI: 10.3973/j.issn.2096-4498.2021.S2.043