ISSN 2096-4498

   CN 44-1745/U

二维码
Optimization of Blasting Scheme for Rear Tunnel of MultiArch Tunnel Without Middle Pilot Heading: a Case Study of Xinmin Tunnel
ZHANG Wei, WANG Shaofei, YU Jia, BAI Hongda
Tunnel Construction . 2022, (S2): 412 -420 .  DOI: 10.3973/j.issn.2096-4498.2022.S2.051