ISSN 2096-4498

   CN 44-1745/U

二维码

Synchronous Backfilling Technology for Gravel and Bottom Grouting Behind Double-Shield Tunnel Boring Machine Segment: A Case Study of a

Section of Qingdao Metro Line 6

WANG Shouhui, YANG Xing, JIANG Yusheng, LIU Quanwei, ZHAO Jizeng, ZHU Zhijing, SHAO Changzhi, TAN Zhuolin, YANG Zhiyong
Tunnel Construction . 2023, (11): 1954 -1963 .  DOI: 10.3973/j.issn.2096-4498.2023.11.015