ISSN 2096-4498

   CN 44-1745/U

二维码
Case Study on "Shield Boring+Segment Erection" Synchronization Technology in Tunneling by Super-Large Diameter Slurry Balanced Shield
ZHU Yeting, ZHU Yanfei, QIN Yuan, ZHAO Jian, WANG Zhihua, GONG Wei
Tunnel Construction . 2024, (11): 2271 -2282 .  DOI: 10.3973/j.issn.2096-4498.2024.11.017