ISSN 2096-4498

   CN 44-1745/U

二维码
Interactive Influence and Deformation Control of Construction Timing in Pile-Beam-Arch Method Metro Stations With Tunnel-Before-Station Sequence
FENG Jimeng, LI Yifei, YAO Shiyu, WANG Shengtao, ZHANG Junru, SUN Ning
Tunnel Construction . 2026, (1): 183 -193 .  DOI: 10.3973/j.issn.2096-4498.2026.01.015