ISSN 2096-4498
CN 44-1745/U
Home
Solicit Contributions
Writing Requirements
Editorial Board
Council Members
Publication Ethics
Open Access
Advertising
Contact Us
中文
Investigation and Prevention Measures for Persistent Debris Flows During Tunnel Construction: A Case Study of Diversion Tunnel at Chuosijia Hydropower Station
ZHONG Guo, CUI Zhengwei, ZHANG Shishu, MA Jingen, XIAO Huabo, HU Qinglong, WANG Nengfeng
Tunnel Construction . 2026, (
S1
): 387 -396 . DOI: 10.3973/j.issn.2096-4498.2026.S1.033