ISSN 2096-4498

   CN 44-1745/U

二维码
Optimization of Connection Rebar between Secondary
Lining and Cable Duct in Highway Tunnels
YANG Hongshe
Tunnel Construction . 2009, (3): 325 -328,360 .  DOI: B