ISSN 2096-4498

   CN 44-1745/U

二维码
Construction and Distortion Analysis of Piperoof Installed in
Chongwenmen Metro Station Underneath Existing Metro Line
CHEN Gao, JIANG Jing-Shan, TAO Hai-Bei
Tunnel Construction . 2006, (1): 78 -80 .  DOI: A