ISSN 2096-4498

   CN 44-1745/U

二维码
Countermeasures for Tunnel/shaft Construction in Water
bearing Sand Layers: Case Study on Beijing Metro
ZHANG Guo-Liang, Wang-Jian-Cheng
Tunnel Construction . 2006, (3): 44 -47 .  DOI: B