ISSN 2096-4498

   CN 44-1745/U

二维码
Selection of Construction Scheme for Connection
Section between Horizontal Adit and Main Tunnel in Soft Ground
XU Jing, WANG An-Hong, NIU Gang, CHEN Jian
Tunnel Construction . 2010, (2): 182 -185,198 .  DOI: B