隧道建设(中英文) ›› 2019, Vol. 39 ›› Issue (3): 488-495.DOI: 10.3973/j.issn.2096-4498.2019.03.021

• 施工技术 • 上一篇    下一篇

结构分割转换工法在地下车库建设中的应用研究

李洋, 高毅, 于少辉, 程鹏, 罗雨田   

  1. (中铁工程装备集团有限公司地下空间设计研究院, 河南 郑州 450016)
  • 收稿日期:2018-07-05 修回日期:2019-03-15 出版日期:2019-03-20 发布日期:2019-04-03
  • 作者简介:李洋(1984—),男,河南洛阳人,2006年毕业于中国地质大学(北京),土木工程专业,本科,高级工程师,主要从事隧道及地下工程科研工作。Email: thinkweed@foxmail.com。

Application of Structural Cut and Convert Method to Construction of Underground Parking Lot

LI Yang, GAO Yi, YU Shaohui, CHENG Peng, LUO Yutian   

  1. (Underground Space Research and Design Institute, China Railway Engineering Equipment Group Co., Ltd., Zhengzhou 450016, Henan, China)
  • Received:2018-07-05 Revised:2019-03-15 Online:2019-03-20 Published:2019-04-03

摘要:

地下车库空间跨度大、建筑功能和结构复杂,通常采用明挖法建造,但在中心城区,明挖法受环境条件限制难以实施,而传统暗挖法建造存在难度大、风险高、效率低的问题。结构分割转换工法(CC工法)通过将大型地下空间结构分割成小型单元,分部实施机械化暗挖后再整体转换,最终形成大断面地下空间。将其应用于地下车库建设可有效减少建设过程对地面环境的影响,并且施工速度快、安全性好。如何将地下车库的建筑结构设计与施工工法进行结合,达到设计合理、施工安全便捷和造价经济的目的,是该工法应用的首要核心问题。本文针对这一问题开展研究讨论,并结合具体案例,提出建议和结论,以期对类似工程提供借鉴和参考。

关键词: 地下停车库, 结构分割转换工法(CC工法), 地下空间

Abstract:

With the characteristics of large space span, complex building function and structure, the underground parking lot is usually constructed by opencut method, while in central urban area, opencut method is difficult to be carried out due to environmental constraints, and the traditional underground excavation methods are considered to be difficult, risky and inefficient. Hence, as a new construction method of underground space, the structural cut and convert (CC) method is proposed. The method divides the largescale underground space structure into small units, and then converts the whole structure into permanent structural system after the implementation of mechanized excavation of each part, and finally forms a large crosssection underground space. The application of the method to the underground parking lot construction can effectively reduce the influences of construction on ground environment, and the whole construction process is safe and fast. How to combine the structural design of underground parking lot with construction method to achieve rational design and safe, convenient and costeffective construction is the primary issue for the application of the method. A case study is made about the CC method, and some suggestions are put forward so as to provide references for similar projects in the future.

Key words: underground parking lot, structural cut and convert (CC) method, underground space

中图分类号: