隧道建设(中英文) ›› 2020, Vol. 40 ›› Issue (6): 873-879.DOI: 10.3973/j.issn.2096-4498.2020.06.013

• 施工技术 • 上一篇    下一篇

大跨隧道预应力锚索承载力提升技术研究——以京张高铁八达岭长城站为例

罗都颢1, 蒋思1, 刘建友2   

  1. 1. 中铁五局集团第四工程有限责任公司, 广东 韶关 512031;2. 中铁工程设计咨询集团有限公司, 北京 100055)

  • 出版日期:2020-06-20 发布日期:2020-06-29
  • 作者简介:罗都颢(1976—),男,陕西扶风人,2001年毕业于吉林大学,勘查技术与工程专业,本科,高级工程师,从事隧道及地下工程施工等研究工作。E-mail: 67090806@qq.com。

Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station

LUO Duhao1, JIANG Si1, LIU Jianyou2   

  1. (1. The Fourth Engineering Company of China Railway No. 5 Engineering Group Co., Ltd., Shaoguan 512031, Guangdong, China; 2. China Railway Engineering Consulting Group Co., Ltd., Beijing 100055, China)

  • Online:2020-06-20 Published:2020-06-29

摘要: 为解决大跨度隧道常规预应力锚索承载力不足的难题,采用理论分析和现场试验对提升预应力锚索抗拔承载力的方法进行研究,提出增加锚固节和高压注浆2种提升预应力锚索抗拔承载力的方法和配套施工工艺。研究结果表明: 影响预应力锚索抗拔承载力的主要因素为锚固段注浆体与筋体抗拔承载力及注浆体与地层间的抗拔承载力,通过增加锚固节和高压注浆工艺,可显著提升预应力锚索抗拔承载力,缩减工期,降低成本,确保锚索张拉力达到设计要求,具有较高的技术经济效益。

关键词: 大跨度隧道, 预应力锚索, 抗拔力, 现场试验

Abstract: The bearing capacity of conventional prestressed anchor cable in largespan tunnel is always insufficient. As a result, the methods for improving the bearing capacity of prestressed anchor cable are studied by theoretical analysis and field test; and the methods of increasing anchor joint and high pressure grouting are proposed. The research results show that: (1) The main factors affecting the bearing capacity of prestressed anchor cable are the pullout bearing capacity of grouting body and reinforcement body in anchoring section and that between grouting body and strata. (2) By increasing anchor joint and adopting high pressure grouting technology, the bearing capacity of prestressed anchor cable can be improved significantly, the construction period can be shortened, the construction cost can be reduced, and the cable tension can meet the design requirements with high technoeconomic benefit.

Key words: largespan tunnel, prestressed anchor cable, pullout resistance, field test