新建隧道管幕法下穿既有铁路路基施工技术研究

李豪杰   

  1. (中铁十七局集团有限公司, 山西 太原 030000)
  • 出版日期:2021-07-30 发布日期:2021-08-30
  • 作者简介:李豪杰(1983—),男,山东东明人,2007年毕业于吉林建筑工程学院,土木工程专业(交通土建方向),本科,工程师,现从事隧道及地下工程施工与管理工作。E-mail: 2799881664@qq.com。

Construction Technology of NewlyBuilt Tunnel Crossing underneath Existing Railway Subgrade Using PipeCurtain Method

LI Haojie   

  1. (China Railway 17th Bureau Co.〖, Ltd. Taiyuan 030000, Shanxi, China)
  • Online:2021-07-30 Published:2021-08-30

摘要: 为有效保障既有铁路运营安全和解决新建隧道施工安全难题,依托新建隧道洞口段下穿铁路路基特殊工况,采用工程类比法提出一种管幕施工下穿铁路路基施工工法,主要涉及管幕施作、隧道开挖2个工艺,简单介绍基坑开挖、反力墙和导向墙施作、掌子面超前支护等该工法的前期工作,并深入分析探讨了管幕施作流程、精确顶进、管内注浆、隧道开挖、隧道支护等重点工序和关键技术。最后分析总结监测结果,认为该下穿施工工法具有安全实用性: 地表累计沉降最大值为19.2 mm,新建隧道下穿段拱顶沉降最大值25.61 mm,最大水平收敛17.5 mm,实现零预警施工开挖,隧道开挖面安全快速通过下穿段,保证了运营线的安全运营和隧道结构稳定,还解决了施工进度和安全的矛盾。

关键词: 下穿铁路路基, 大断面隧道, 管幕法

Abstract: To guarantee the operation safety of the existing railway and the construction safety of newlybuilt tunnel, a pipecurtain method is proposed for the newlybuilt tunnel when crossing underneath existing railway subgrade using engineering analogy method. The technology includes pipecurtain construction and tunnel construction. The preliminary works of foundation pit excavation, reaction wall and guide wall construction, and advance support of the tunnel face are introduced, and indepth analysis and discussion is conducted on key procedures and technologies such as pipe curtain construction process, precise jacking, grouting in pipe, tunnel excavation, tunnel support, etc. Finally, the monitoring results are analyzed, and the results show that the pipecurtain method adopted in underpass construction is safe and practical, the maximum cumulative settlement of the surface is 19.2 mm, the maximum settlement of the tunnel crown at underpass section is 25.61 mm, and the maximum horizontal convergence is 17.5 mm, realizing zerowarning construction. The safe operation of the existing railway and the construction of newlybuilt tunnel have been guaranteed, and the construction schedule has been reduced.

Key words: underpass railway subgrade, large crosssection tunnel, pipecurtain method

中图分类号: