• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2021, Vol. 41 ›› Issue (S1): 470-.DOI: 10.3973/j.issn.2096-4498.2021.S1.062

• 施工技术 • 上一篇    下一篇

川藏铁路隧道主要不良地质TBM适应性分析及施工关键技术

王彦杰1, 李苍松1, 2, 史永跃2, 张涛1, 王彬1   

  1. 1.西南石油大学地球科学与技术学院, 四川 成都 610500;2.中铁西南科学研究院有限公司, 四川 成都 611731)

  • 出版日期:2021-07-30 发布日期:2021-08-30
  • 作者简介:王彦杰(1994—),男,四川广元人,西南石油大学地质工程专业在读硕士,研究方向为岩土工程与隧道地质灾害防治。 E-mail: 467575587@qq.com。
  • 基金资助:
    中铁西南科学研究院有限公司科技项目(2019-Z004-KJB04-DZ

Adaptability Analysis of TBM in Main Unfavorable Geological of Sichuan-Tibet Railway Tunnel and Its Key Construction Technologies

WANG Yanjie1 LI Cangsong1, 2 SHI Yongyue2 ZHANG Tao1 WANG Bin1   

  1. (1. School of Geoscience and Technology, Southwest Petroleum University, Chengdu 610500, Sichuan, China;  2. China Railway Southwest Research Institute Co, Ltd., Chengdu 611731, Sichuan, China)
  • Online:2021-07-30 Published:2021-08-30

摘要: 为全面认识川藏铁路隧道TBM施工地质适应性问题,分析其主要不良地质条件,系统研究TBM施工适应性特点,从岩爆、软岩大变形、涌突水、高地温4个方面论证,得出TBM施工的地质适应性为“弱适应”,并分别阐述TBM施工的关键技术: 1)岩爆及软岩大变形区域,根据地质预报及现场工作情况采取相应的支护措施及施工对策; 2)涌水段施工,针对裂隙状渗水、非裂隙状涌水,可采取“水压分流排水+灌浆封堵加固 ”进行处理; 3)高地温段施工中,除常规通风物理降温措施外,针对富热水高温段还需采取限量排水、注浆封堵以减少热水涌出量,并采取结构防热。

关键词:

铁路隧道, 川藏铁路, TBM施工, 不良地质问题, 地质适应性, 施工对策

Abstract: To fully study the geological adaptability of TBM in SichuanTibet railway tunnel construction, the main unfavorable geological conditions of SichuanTibet railway tunnel are comprehensively analyzed and the adaptability characteristics of TBM are systematically studied. With analysis of the four aspects of geological conditions, i.e. rock burst, large deformation of soft rock, water inrush, and high ground temperature, it is demonstrated that the geological adaptability of TBM construction is weak. The key techniques of TBM construction are described as follows: (1) In the area of rockburst and large deformation of soft rock, corresponding support and construction countermeasures should be taken according to geological prediction and field conditions. (2)For fractured seepage and nonfractured water inrush, the construction of water inrush section can be treated by hydraulic shunt drainage or grouting plugging and reinforcment. (3) In addition to the conventional ventilation physical cooling measures in the construction of high ground temperature section, limited drainage and grouting should be adopted to reduce the amount of hot water gushing in the hightemperature section with rich hot water, and structural heat prevention should be adopted.