• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2022, Vol. 42 ›› Issue (S1): 449-458.DOI: 10.3973/j.issn.2096-4498.2022.S1.053

• 施工技术 • 上一篇    下一篇

沉管隧道钢筋混凝土管节预制及下水工艺比选研究

王晓东, 李洪斌   

  1. (中交四航局第二工程有限公司, 广东 广州〓510300
  • 出版日期:2022-07-22 发布日期:2022-08-23
  • 作者简介:王晓东(1992—),男,山西寿阳人,2021年毕业于华南理工大学,工程管理专业,硕士,工程师,现从事沉管隧道领域、大型工程技术管理与科研工作。Email: 489409100@qq.com。

Comparative Study on Prefabrication & WaterEntry Technology of Reinforced Concrete Element of Immersed Tunnel

WANG Xiaodong, LI Hongbin   

  1. (The Second Engineering Company of CCCC Fourth Harbor Engineering Co., Ltd., Guangzhou 510300, Guangdong, China)
  • Online:2022-07-22 Published:2022-08-23

摘要: 对现有的沉管隧道管节预制方法进行分析,研究固定干坞法、移动干坞法和工厂法的通用工艺流程,分析各个工艺的建设条件、工艺特点及施工难点,提出钢筋混凝土管节预制方法选用表。通过对3种管节预制方法的深入研究,剖析各方法的差异性,得出管节预制方法的3类区别。利用工艺组合的方法,构建了6种工艺,从创新性、效益、可行性等多角度综合分析,剔除成熟工艺和成本投入较大的工艺,提出管节平地流水线预制动态入水新工艺,并就其应用进行深入研究,同时将其与现有工艺在工期、造价等方面进行定量对比分析,分析结果显示,该工艺具有一定的优势。

关键词: 沉管隧道, 钢筋混凝土, 管节预制, 管节入水, 工艺组合, 平地流水线预制

Abstract: In this paper, the existing prefabrication methods of immersed tunnel elements are systematically analyzed and studied, the general process flow of fixed dry dock method, mobile dry dock method, and factory method are discussed, the process characteristics and construction difficulties of each technology are analyzed, and a selection table of precast methods for reinforced concrete elements is proposed. Through indepth investigation of the three methods, differences are obtained. Furthermore, six combinations are constructed regarding the process classification. Based on the comprehensive comparison and selection from multiple perspectives including the novelty, costefficiency, and feasibility, the mature and highcost processes are ruled out, whereas the technology of flat ground flow line prefabrication of element and dynamic water entry is recommended. Finally, the application of the specific case is studied, and the quantitative comparative analysis with the existing process in terms of time limit and cost is conducted. The analytical results show that the process has certain advantages and is worth popularizing.

Key words:  , immersed tunnel, reinforced concrete, element prefabrication, element water entry, process combination, flat flowline prefabrication