公路隧道斜井开挖支护碳排放特性

徐建峰1, 徐忠林1, 郭春2, *, 袁坤1, 董海疆1, 杨小兵1, 杨永鹏1, 田野1, 陈昱圻1   

  1. 1. 国网成都供电公司电缆运检中心, 四川 成都 610041 2. 西南交通大学土木工程学院, 四川 成都 610031
  • 出版日期:2023-07-20 发布日期:2023-08-06
  • 作者简介:徐建峰(1992—),男,安徽淮南人,2021年毕业于西南交通大学,桥梁与隧道工程专业,博士,工程师,现从事电力隧道运维检修工作。Email: xujf92@163.com。*通信作者: 郭春, Email: guochun@swjtu.edu.cn。

Characteristics of Carbon Emissions from Excavation and Supporting During Construction of Inclined Shafts of Highway Tunnels

XU Jianfeng1, XU Zhonglin1, GUO Chun2, *, YUAN Kun1, DONG Haijiang1, YANG Xiaobing1,YANG Yongpeng1, TIAN Ye1, CHEN Yuqi1   

  1. (1. Operation and Maintenance Center of State Grid Chengdu Power Supply Company, Chengdu 610041, Sichuan, China; 2. School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031, Sichuan, China)
  • Online:2023-07-20 Published:2023-08-06

摘要: 为解决公路隧道斜井施工关键排放源和影响因素不清晰的问题,基于依托工程Ⅳ级和Ⅴ级围岩斜井支护设计,结合《公路工程预算定额》和《公路工程机械台班费用定额》,明确斜井施工投入的材料及能源清单数据,采用排放系数方法,计算不同工序材料、能源的碳排放,分析斜井坡度和长度改变对开挖和出渣碳排放的影响。研究表明: 1)Ⅳ级和Ⅴ级围岩每延米斜井施工碳排放分别为17.95 tCO2eq和27.00 tCO2eq。 2)随着围岩级别上升,喷射混凝土和钢支撑碳排放快速增长。3)当斜井长度超过1 500 m,长度每增加100 m,开挖和出渣的碳排放增加0.15~0.2 tCO2eq。 4)在坡度为7°、9°、12°和25°时,每延米斜井出渣碳排放为0.37~0.69 tCO2eq;在斜井坡度超过12°时,采用有轨运输方式出渣较汽车运输更加低碳。

关键词: 公路隧道, 斜井, 碳排放, 排放系数法, 坡度

Abstract:

The key sources and influencing factors of emissions from the construction of inclined shafts of highway tunnels remain unclear. Therefore, a data inventory is developed for the materials used and energy consumed in the construction of inclined shafts, and the characteristics of carbon emissions from inclinedshaft construction are studied. Further, the emission coefficient method is employed to calculate the carbon emissions resulting from adopting different procedures and materials for the construction. In addition, the influence of the slope and length of the inclined shaft on carbon emissions from excavation and mucking is analyzed. For this, support designs of an inclined shaft with Grades and surrounding rocks are used and quota standards, such as theWT5BX Highway Engineering Budget Quota WT5《TNR》〗andWT5BX Highway Engineering Machinery Machine Team Cost Quota, WT5《TNR》〗are followed. The following results are obtained: (1) The carbon emissions from the inclined shaft excavation and support in Grades and surrounding rocks are 17.95 tCO2eq and 27.00 tCO2eq per meter, respectively. (2) The carbon emissions from the construction of shotcrete and a steel support increase rapidly as the grade of the surrounding rocks increases. (3) The carbon emissions from excavation and mucking increase by 0.15~0.2 tCO2eq per 100 m of the inclinedshaft length for lengths exceeding 1 500 m. (4) For a shaft slope of 7°, 9°, 12°, or 25°, the carbon emissions from mucking range from 0.37 to 0.69 tCO2eq per meter. Meanwhile, for shaft slopes >12°, rail transportation produces lower carbon emissions than other mucking methods.

Key words:  , highway tunnel, inclined shaft, carbon emission, emission coefficient method, slope