软土超大直径装配式竖井施工全过程土体与桩体力学响应

余龙1, 徐志兵1, 马春景2   

  1. (1. 上海市隧道工程轨道交通设计研究院, 上海 200235; 2. 广州市市政集团有限公司, 广东 广州 510060)
  • 出版日期:2026-10-20 发布日期:2026-10-20
  • 作者简介:余龙(1985—),男,湖北黄冈人,2010年毕业于同济大学,岩土工程专业,硕士,高级工程师,主要从事城市隧道及地下工程设计与研究工作。E-mail: yu.long@stedi.com.cn。

Soil and Pile Mechanical Response  During Entire Construction Process of Ultra-Large-Diameter Prefabricated Shafts in Soft Soil Strata

YU Long1, XU Zhibing1, MA Chunjing2   

  1. (1. Shanghai Tunnel Engineering & Railway Transit Design and Research Institute, Shanghai 200235, China; 2. Guangzhou Municipal Group Co., Ltd., Guangzhou 510060, Guangdong, China)
  • Online:2026-10-20 Published:2026-10-20

摘要: 为阐明悬吊拼装机械化掘进工法下软土超大直径装配式竖井的土体变形演化与桩-土-井壁协同受力特性,明确关键设计及施工参数的影响效应,以上海市静安区垂直掘进地下智慧车库工程(世界已建成最大直径装配式竖井,开挖直径22.8 m,开挖深度51.0 m)为依托,采用现场自动化监测与FLAC3D三维流固耦合数值模拟相结合的方法开展系统研究。分析竖井动态下沉全过程的地表位移演化、桩体力学响应及土体变形规律,并对桩间距、桩径、桩长、土体加固强度及超挖深度等关键参数进行敏感性分析。研究结果表明: 1)悬吊拼装机械化掘进工法竖井施工引发的地表沉降沿径向呈非线性衰减特征,沉降显著影响边界为22.5 m,最大沉降为12.72 mm,工法环境扰动控制效果良好; 2)抗拔桩与井筒竖向位移呈同步微抬特征,位移均控制在3 mm以内; 3)桩体水平位移呈“中间大、两端小”的分布规律,最大值位于38~41 m深度,且在地层软硬交界面处桩身弯矩显著突变; 4)桩-土变形协同性显著,掘进速度与超挖深度对开挖面稳定性控制作用显著,加固区内外需采取差异化参数管控。基于依托工程,经参数敏感性分析,提出优化设计施工参数为: 1)抗拔桩桩间距4.0 m、桩径1.2 m、桩长70 m; 2)加固区土体无侧限抗压强度1.0 MPa; 3)加固区内超挖深度≤2 m时掘进速度2.5~3.0 m/d,加固区外超挖深度≤1 m时掘进速度1.0~1.5 m/d。

关键词: 软土地层, 超大直径装配式竖井, 施工全过程, 桩体力学响应, 现场监测, 流固耦合数值模拟

Abstract: To elucidate the soil-deformation evolution and cooperative mechanical characteristics of the pile-soil-shaft lining system for ultra-large-diameter prefabricated shafts in soft soil strata using the suspension-assembly mechanized excavation method and to clarify the influence of key design and construction parameters, a systematic study was conducted on the vertical-excavation underground intelligent garage project in Jing’an District, Shanghai. This project was the world’s largest completed prefabricated shaft, with an excavation diameter and depth of 22.8 and 51.0 m, respectively. On-site automatic monitoring and FLAC3D fluid-solid coupling numerical simulation methods were adopted to examine the evolution of ground-surface displacement, pile mechanical responses, and soil-deformation patterns during dynamic shaft sinking. Sensitivity analysis was conducted for key parameters, including pile spacing, pile diameter, pile length, soil reinforcement strength, and over-excavation depth. Results confirm the following: (1) The ground settlement due to shaft construction presents a nonlinear attenuation trend along the radial direction, with 22.5 m as the substantial influence boundary of settlement. The maximum recorded settlement is 12.72 mm, confirming the proposed method’s excellent control of environmental disturbance. (2) The uplift piles and shaft show a synchronous slight upward displacement during construction, with all vertical displacements controlled within 3 mm. (3) The horizontal displacement of the piles follows a distribution pattern of “large in the middle and small at both ends”, with the maximum value occurring at a depth of 38-41 m. A significant abrupt change in pile bending moment is observed at the soft stratum-hard stratum interface. (4) The pile-soil system exhibits remarkable cooperative deformation behavior. Excavation speed and over-excavation depth exert dominant control on excavation face stability; thus, differentiated parameter control must be implemented inside and outside the reinforcement area. Based on the engineering case and parameter-sensitivity analysis, the following optimized design and construction parameters are proposed: (1) pile spacing = 4.0 m, pile diameter = 1.2 m, and pile length = 70 m (for uplift piles); (2) unconfined compressive strength = 1.0 MPa (for the soil in the reinforcement area); (3) over-excavation depth ≤ 2 m with an excavation speed = 2.5-3.0 m/d (inside the reinforcement area) and over-excavation depth ≤ 1 m with an excavation speed = 1.0-1.5 m/d (outside the reinforcement area).

Key words: soft soil stratum, ultra-large-diameter prefabricated shaft, entire construction process, pile mechanical response, field monitoring, fluid-solid coupling numerical simulation