运营铁路隧道套衬施工机械化配套研究与应用

田雪豪, 宋丹, 江帅, 付开勇, 高立君, 王柏松   

  1. (中铁工程装备集团隧道设备制造有限公司, 河南 新乡 453000

  • 出版日期:2024-02-20 发布日期:2024-03-11
  • 作者简介:田雪豪(1992—),女,河南周口人,2018年毕业于郑州大学,机械电子工程专业,硕士,工程师,现从事隧道施工装备设计研发工作。Email: txh_zzu@163.com。

Research and Application for Mechanization of Lining Construction of Operating Railway Tunnels

TIAN Xuehao, SONG Dan, JIANG Shuai, FU Kaiyong, GAO Lijun, WANG Baisong   

  1. (China Railway Engineering Equipment Group Tunnel Equipment Manufacturing Co., Ltd., Xinxiang 453000, Henan, China)

  • Online:2024-02-20 Published:2024-03-11

摘要:

为解决运营铁路隧道衬砌病害治理施工安全系数低、劳动强度大、施工人员需求多、施工质量参差不齐的问题,调研分析套衬加固病害整治工法、施工设备需求及铁路在轨运行设备规范,研究设备配套技术,形成一套适用于运营铁路隧道套衬施工的机械化装备及施工组织方案,并在某高铁隧道套衬工程中试点应用。应用结果表明: 1)该成套设备利用运营天窗点的有限时间进行作业,具有集成化、模块化、机械化、专业化的特点; 2)该成套设备实现了在作业人员减少一半以上的情况下工效提高2倍以上的目标; 3)应急解决预案可靠有效,可实现对突发状况的处理。

 

关键词: 运营铁路隧道, 套衬, 机械化, 衬砌病害整治

Abstract:

When dealing with lining diseases of operating highspeed railway tunnels, problems such as low safety factor, high labor intensity, large demand for construction personnel, and uneven construction quality are encountered. Therefore, the construction equipment requirements and specifications for railway online equipment are investigated and analyzed, and the equipmentsupporting technology is studied as an existing treatment method for lining reinforcement disease. A set of mechanized equipment and construction organization schemes suitable for the lining construction of railway tunnels is formed. This equipment technique was applied to a highspeed railway tunnel lining project. The application results show the following: (1) The operation is conducted on a limited time basis by using the operating skylight point, which has the characteristics of integration, modularization, mechanization, and specialization. (2) In the case of reducing the number of operators by more than half, the work efficiency is increased by more than two times. (3) The emergency solution plan is reliable and effective and can handle emergencies.

Key words:  , operating railway tunnels, lining construction, mechanization, lining disease treatment