ISSN 2096-4498 CN 44-1745/U
隧道建设(中英文) ›› 2011, Vol. 31 ›› Issue (S2): 17-20.
• 规划与设计 • 上一篇 下一篇
贺善宁
收稿日期:
修回日期:
出版日期:
发布日期:
作者简介:
HE Shanning
Received:
Revised:
Online:
Published:
摘要: 始发竖井作为盾构施工中重要的构筑物之一,其设计方案的选择往往受到场地条件的制约,其设计方案的好坏直接决定后期的施工进度。对盾构始发辅助竖井及横通道设计进行探讨,根据现场实际情况,结合盾构始发辅助竖井功能的需求,对竖井结构形式和几种不同的横通道进洞方案进行了比选,提出了合理的施工方案,确保工程顺利完成。
关键词: 盾构始发, 浅埋暗挖, 竖井设计, 横通道设计
Abstract: Vertical shaft for shield launching is an important structure for construction. The construction condition impacts a lot on the designing which directly controls the construction scheme. The desiging of assistant vertical shaft for shield launching and passway is discussed, the structure types of vertical shaft and modes of main tunnel into passway are comparatively selected according to the requirements. The rational designing plan is proposed. In the end, safe construction is guaranteed.
Key words: shield launching, shallow cover, mining method, vertical shaft, design
贺善宁. 盾构始发辅助竖井及横通道设计探讨[J]. 隧道建设, 2011, 31(S2): 17-20.
HE Shanning. Designing of Assistant Vertical Shaft for Shield Launching and Passway[J]. Tunnel Construction, 2011, 31(S2): 17-20.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/
http://www.suidaojs.com/CN/Y2011/V31/IS2/17
四线大断面隧道浅埋暗挖下穿综合管廊保护方案研究——以广佛城际下穿华康道管廊工程为例
大断面马蹄形盾构施工关键技术——以蒙华铁路白城隧道工程为例
黄土地区地铁双连拱隧道浅埋暗挖施工变形特征研究——以西安地铁5号线停车场出入场线工程为例