ISSN 2096-4498 CN 44-1745/U
隧道建设(中英文) ›› 2015, Vol. 35 ›› Issue (S2): 147-152.DOI: 10.3973/j.issn.1672-741X.2015.S2.026
• 施工技术 • 上一篇 下一篇
夏站辉
收稿日期:
修回日期:
出版日期:
发布日期:
作者简介:
XIA Zhanhui
Received:
Revised:
Online:
Published:
摘要:
结合天津地铁3号线解放桥站—天津站站盾构区间工程实例,为了解决在特级风险源极复杂的地面环境下穿越高富水承压软弱地层进行盾构接收工作的风险问题,采用洞内水平加固结合混凝土箱接收技术,成功控制各项沉降指标,同时,有效地避免盾构到达接收过程中涌水、涌砂等风险,以期为今后类似工程提供借鉴和参考。
关键词: 盾构掘进, 混凝土箱接收, 冷冻施工, 高富水软弱地层
Abstract:
The Jiefangqiao StationTianjing Railway Station Station shieldbored section on No. 3 Line of Tianjin Metro has to cross waterrich and soft ground under extremely complicated environment. As a result, horizontal reinforcement in tunnel + concrete receiving box construction technology is adopt, and good effect has been received. The paper can provide reference and guidance for similar projects in the future.
Key words: shield tunneling, concrete box receiving, freezing construction, waterrich and soft ground
中图分类号:
U 455
夏站辉. 盾构施工混凝土箱接收技术[J]. 隧道建设, 2015, 35(S2): 147-152.
XIA Zhanhui. Technologies for Shield Arriving[J]. Tunnel Construction, 2015, 35(S2): 147-152.
0 / / 推荐
导出引用管理器 EndNote|Ris|BibTeX
链接本文: http://www.suidaojs.com/CN/10.3973/j.issn.1672-741X.2015.S2.026
http://www.suidaojs.com/CN/Y2015/V35/IS2/147