Research on Optimization of Design of TBM Disassembling Cavern and Hoisting System
HUANG Jinguang1, 2
(1. China Railway Tunnel Group Co., Ltd., Luoyang 471009, Henan, China; 2. State Key Laboratory of Shield Machine and Boring Technology, Zhengzhou 450001, Henan, China)