隧道建设(中英文) ›› 2017, Vol. 37 ›› Issue (8): 1032-1036.DOI: 10.3973/j.issn.1672-741X.2017.08.018

• 施工技术 • 上一篇    下一篇

运营期地铁联络通道融沉注浆治理技术

李增理, 王炜*   

  1. (中铁电气化局集团铁路工程公司, 北京 100036)
  • 收稿日期:2017-04-14 修回日期:2017-07-09 出版日期:2017-08-20 发布日期:2017-08-22
  • 作者简介:李增理(1964—),男,陕西宝鸡人,1988年毕业于兰州铁道学院,铁道工程专业,本科,高级工程师,主要从事地铁工程、铁路工程的施工管理与技术管理工作。Email: LK710605930@163.com。*通信作者: 王炜, Email: Huoer_go@126.com。

Grouting Technology for Thaw Settlement of Metro Cross Passage during Operation Period

LI Zengli, WANG Wei*   

  1. (China Railway Electrification Bureau Group Railway Engineering Company, Beijing 100036, China)
  • Received:2017-04-14 Revised:2017-07-09 Online:2017-08-20 Published:2017-08-22

摘要:

为解决南京某地铁冻结法施工联络通道运营期间发生的后融沉问题,从地层特性、施工工艺和外界环境等方面对融沉原因进行分析,地基软弱、工序衔接不当、融沉注浆不足等是联络通道及附近隧道发生融沉与破坏的主要原因。提出融沉治理原则和工艺,采用“多点,均匀,少量,多次”的劈裂-挤密注浆方法对联络通道周围地层加固,并在施工影响范围内布置监测点对注浆效果实时监测。结果表明: 在劈裂-挤密注浆方法的基础上,辅以地层排水能够有效防止地层沉降,确保隧道结构稳定; 在注浆过程中,联络通道沉降可分为快速回落、稳定回落和稳定3阶段,各阶段的沉降速率和排水量都有鲜明的特点; 加固后隧道上行线最大隆起31.2 mm、下行线最大隆起29.8 mm,联络通道342 d沉降监测结果小于1 mm,表明隧道已处于稳定状态,治理效果较好。

关键词: 地铁, 联络通道, 软土, 冻结法, 融沉, 注浆加固

Abstract:

The thaw settlement occurs in cross passage of a metro in Nanjing constructed by freezing method during operation period. The causes for the thaw settlement, i. e. soft ground, irrational procedure connection and insufficient thaw settlement grouting, are analyzed in terms of ground characteristics, construction technology and environment factors. The thaw treating principle and technology of splittingcompaction grouting are adopted to reinforce the surrounding ground of cross passage, and grouting effect monitoring points are arranged within construction influencing scope. The results show that: 1) The thaw settlement can be effectively controlled by supplemented ground drainage on the basis of splittingcompaction grouting. 2) The settlement of cross passage during grouting can be divided into 3 phases, i. e. fast slowing down period, low slowing down period and stable period; the settlement rates and drainage volumes of every period are distinctive. 3)The maximum rising height of upline and downline of separated tunnels is 31.2 mm and 29.8 mm respectively; and the settlement of cross passage 342 days after grouting is less than 1 mm which indicates the rationality and feasibility of the grouting method.

Key words: metro, cross passage, soft soil, freezing method, thaw settlement, grouting reinforcement

中图分类号: