• 中国科学引文数据库(CSCD)来源期刊
  • 中文核心期刊中文科技核心期刊
  • Scopus RCCSE中国核心学术期刊
  • 美国EBSCO数据库 俄罗斯《文摘杂志》
  • 《日本科学技术振兴机构数据库(中国)》
二维码

隧道建设(中英文) ›› 2018, Vol. 38 ›› Issue (1): 72-79.DOI: 10.3973/j.issn.2096-4498.2018.01.009

• 施工技术 • 上一篇    下一篇

地铁暗挖车站STS管幕结构施工技术研究

赵文1, 董驾潮1, 贾鹏蛟1,*, 石建军2, 肖俊航1, 刘强2   

  1. (1. 东北大学资源与土木工程学院, 辽宁沈阳 110819; 2. 中铁七局集团第三工程有限公司, 陕西西安 710032)
  • 收稿日期:2017-08-15 修回日期:2017-10-27 出版日期:2018-01-20 发布日期:2018-02-01
  • 作者简介:赵文(1962—),男,辽宁沈阳人,1991年毕业于东北大学,矿山建设工程专业,博士,教授、博士生导师,主要从事隧道与地下工程方面的研究工作。Email: wenneu@163.com。*通信作者: 贾鹏蛟, Email: jpengjiao@163.com。
  • 基金资助:

    国家自然科学基金资助项目(51578116);中央高校基本科研业务专项资金资助(N160106006)

Study of Construction Technology of Steel Tube Slab Structure for Mined Metro Station

ZHAO Wen1, DONG Jiachao1, JIA Pengjiao1, *, SHI Jianjun2, XIAO Junhang1, LIU Qiang2   

  1. (1. School of Resources and Civil Engineering, Northeastern University, Shenyang 110819, Liaoning, China; 2. The Third Engineering Co., Ltd. of China Railway Seventh Group, Xi′an 710032, Shaanxi, China)
  • Received:2017-08-15 Revised:2017-10-27 Online:2018-01-20 Published:2018-02-01

摘要:

在复杂地质及多风险源地段修建地铁车站,传统的暗挖工法不能满足施工需要,STS(steel tube slab)管幕工法作为一种修建超浅埋地铁暗挖车站的新型施工方法被提出。以STS管幕结构修建沈阳地铁某车站为依托,结合现场施工,通过现场试验和监测对顶管过程中的注浆减阻、管间掏土、螺栓连接、混凝土灌注和地表沉降等进行研究,解决了钢管顶进准确定位的难题和大直径带翼缘板钢管减阻问题,得到清理管间土和混凝土灌注的施工方法,并确保了STS管幕工法修建地铁暗挖车站管幕结构的成功实施。

关键词: STS管幕工法, 超浅埋暗挖地铁车站, 钢顶管, 注浆减阻, 混凝土灌注, 地表沉降

Abstract:

The traditional mining method can not meet the requirements of tunnel construction in complex geology and area with multiple risk sources. As a result, the steel tube slab (STS) pipe curtain method, a new construction method for ultrashallow buried metro stations is proposed. The drag reduction by grouting, soil cleaning between steel tubes, bolt connection, concrete pouring and ground surface settlement during pipe jacking of a metro station in Shenyang constructed by STS pipe curtain method are studied by field test and monitoring. And then a series of problems have been solved; a series of technologies have been developed; therefore the successful construction of mined metro station by STS pipe curtain method has been guaranteed.

Key words: steel tube slab (STS) pipe curtain method, ultrashallow buried mined metro station, steel pipe jacking, drag reduction by grouting, concrete pouring, ground surface settlement