Abstract: In the test of prestressed rock bolt in construction of Jinping Hydropower Station, the actual tensioning length could not meet the requirements. Free tensioning test on the free rock bolt section is carried out in the workshop, and construction tensioning test is carried out in the site, so as to obtain the variation rules of the tensioning length of prestressed rock bolt. The tests showed that the variation rules of the tensioning length of the prestressed rock bolt are complicated under different conditions, and can be affected by construction technologies, rock bolt material, temperature and tensioning force. The tests proved that the tensioning lengths of the rock bolts tested can not meet the theoretical requirements, but the locking capacity of the rock bolts is almost unaffected. Therefore, the control of the tensioning force of the prestressed rock bolts is the key in the control of the tensioning quality of the rock bolts, and the tensioning length can be regarded as the reference value.
Key words: Jinping I Hydropower Station, underground powerhouse, prestressed rock bolt, tensioning length, tensioning test
ZHANG Chuan-Gong. Analysis on Tensioning Length Test on Prestressed Rock Bolt in Construction of Underground Powerhouse of Jinping I Hydropower Station[J]. Tunnel Construction, 2012, 32(4): 467-473.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2012.04.007
http://www.suidaojs.com/EN/Y2012/V32/I4/467