Abstract: Luoxi stationNanzhou station shield tunneling section on the extended section of No. 2 and No. 8 line of Guangzhou Metro passes through the pile group of Caihong Garden. Many piles intrude into the clearance of the shieldbored tunnel, therefore Caihong Garden should be reinforced. Furthermore, the operation space for the reinforcement is small. Micro steel pipe piles with 350 mm diameter are adopted to underpin the pile foundation. When the shield arrives at the position of the existing piles, the piles are cut and reinforcement is made. During the reinforcement, the settlement of the buildings is stable and expected reinforcement effect is achieved.
Key words: Metro, shieldbored tunnel, largediameter micro steel pipe pile, underpinning, reinforcement
XIE Yongsheng. Application of Largediameter Micro Steel Pipe Pile Underpinning Technology in Construction of Metro Works[J]. Tunnel Construction, 2012, 32(4): 537-543.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2012.04.019
http://www.suidaojs.com/EN/Y2012/V32/I4/537
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network