ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2012, Vol. 32 ›› Issue (6): 782-787.DOI: 10.3973/j.issn.1672-741X.2012.06.006
• wenzhang • Previous Articles Next Articles
CHENG Zhengming
Received:
Revised:
Online:
Published:
Abstract: Stressstructure model is used to study the backfilling safety and reinforcement technology of the opencut section of Xiang’an subsea tunnel with differential settlement in soft ground. The study results show that the predicted value of the differential settlement of the opencut tunnel is 80 mm, and the minima safety coefficient is 2.11. Although the structural safety coefficient meets the requirements, the differential settlement may induce cracks, dislocations and water seepage, which has serious effects on the operation function and durability of the tunnel. Countermeasures, including reinforcing the arch feet by largediameter root piles, reinforcing the invert by TSS steel pipe grouting, crack sealing by grouting, and backfilling symmetrically and layer by layer, are proposed. The monitoring results show that the predicted settlement coincides well with the measured settlement, the reinforcement has achieved good effect, and the displacement has been brought under effective control.
Key words: Xiang’an subsea tunnel, opencut tunnel, soft ground, differential settlement, reinforcement, safety coefficient
CHENG Zhengming. Study on Backfilling Safety and Reinforcement Technology of Opencut Tunnel with Differential Settlement in Soft Ground[J]. Tunnel Construction, 2012, 32(6): 782-787.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2012.06.006
http://www.suidaojs.com/EN/Y2012/V32/I6/782