Tunnel Construction ›› 2012, Vol. 32 ›› Issue (增刊1): 59-64.DOI: 10.3973/j.issn.1672-741X.2012.z1.013

Previous Articles     Next Articles

Technologies for Local Semiring Assembly Shield Passing through Intermediate Ventilation Tunnel

XU Yanjun   

  1. (Track Traffic Engineering Co., Ltd. of China Railway NO.1 Group, Xi’an 710054, China)
  • Received:2012-06-19 Revised:2012-09-18 Online:2012-11-20 Published:2013-02-19

Abstract:

The shield often has to pass through stations and ventilation tunnels in the construction of Metro shieldbored tunnels. There is great difficulty for construction organization and construction technology. The construction organization and technical difficulties and countermeasures of local semiring assembly shield passing through intermediate ventilation tunnel are analyzed. The paper can provide references for similar projects in the future.

Key words: tunnel, local semiring assembling, intermediate ventilation tunnel