Tunnel Construction ›› 2012, Vol. 32 ›› Issue (增刊1): 102-104.DOI: 10.3973/j.issn.1672-741X.2012.z1.022
Previous Articles Next Articles
LIU Jun
Received:
Revised:
Online:
Published:
Abstract:
If the surrounding rocks of asymmetricalloaded and shallowburied tunnel are weathered, collapse often occurs. It is difficult to reserve deformation. The deformation of primary support is large. The 6step CD method, 3step primary invert method, temporary support strengthening method and backfilling method are adopted in the construction of the entrances of Jinlingtou tunnel and Tongyou tunnel on BeijingFuzhou railway. The deformations of surrounding rocks and primary supports are brought under effective control and the safety of the shield passing throught dangerous section is guaranteed.
Key words: asymmetrical load, shallow bury, soft and weak surrounding rock, tunnel
LIU Jun. Construction Technologies for Asymmetricalloaded and Shallowburied Tunnels with Soft Surrounding Rocks[J]. Tunnel Construction, 2012, 32(增刊1): 102-104.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2012.z1.022
http://www.suidaojs.com/EN/Y2012/V32/I增刊1/102
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine
Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station