[1] |
DU Yu.
Research on Several Rehabilitation and Expansion
Schemes Related to Civil Works for Operating Metro Stations
[J]. Tunnel Construction, 2020, 40(7): 1017-1028.
|
[2] |
YAO Yanming, HU Xinpeng, LI Fayong, XIAO Guangliang, HUANG Yi, XIA Hanyong, ZHOU Junhong.
Construction Technology and Application of
Disassembled Shield Passing Through Station in Confined Space: a
Case Study on Ningbo Railway Station
[J]. Tunnel Construction, 2020, 40(7): 1035-1040.
|
[3] |
LUO Wenjing, ZOU Chenglu.
Key Technologies and Numerical Analysis of Metro Station by Cut-and-cover and Mining Method at Semi-diagenetic Stratum in Nanning
[J]. Tunnel Construction, 2020, 40(5): 727-734.
|
[4] |
LI Tiesheng.
Key Technologies for Design and Construction of Metro Station by Pipe-roof PBA Method
[J]. Tunnel Construction, 2020, 40(4): 531-537.
|
[5] |
HU Shuangping, GAO Zhihong.
Seismic Response Analysis of Soil-Column-free
Large-span Metro Station Structure
[J]. Tunnel Construction, 2020, 40(3): 352-363.
|
[6] |
ZHANG Zhenyi, CHEN Wuhang, XU Youjun, LI Wenbo.
Finite Element Mechanical Analysis of Metro Station Constructed by Cut and Cover TopDown Method Based on AM Pile
[J]. Tunnel Construction, 2020, 40(2): 189-194.
|
[7] |
CHEN Nan.
Comprehensive Evaluation of Construction Safety of Deep Foundation Pit of Metro Station Based on IOWA Operator
[J]. Tunnel Construction, 2020, 40(2): 202-208.
|
[8] |
SUN Jiuchun, BAI Tinghui.
Construction Control System of Mechanical State of Metro Deep Foundation Pit in Soft Soil
[J]. Tunnel Construction, 2019, 39(S2): 44-52.
|
[9] |
ZHAO Taidong.
Structural Design and Monitoring Analysis of New-built Mined Tunnel Crossing underneath Existing Metro Station
[J]. Tunnel Construction, 2019, 39(S2): 253-260.
|
[10] |
DU Xianwu, LIU Yunsi, GUO Lei, YANG Yuping, LI Xiaolei, WANG Jing, ZHOU Xiaolong.
Dewatering Technology of PBA Metro Station under Complex Environment
[J]. Tunnel Construction, 2019, 39(S2): 326-334.
|
[11] |
LIANG Xiaoliang, SHI Qingneng, DENG Lin, TANG Yong, LIU Shouhua, YANG Junsheng.
Comparison and Selection of Construction Schemes for Interchange Node under Existing Operating Metro Stations
[J]. Tunnel Construction, 2019, 39(S1): 369-376.
|
[12] |
BAI Jianying, WANG Bufan, XIA Yangyuyu.
Typical Risk Identification of Highway Tunnel Operation
[J]. Tunnel Construction, 2019, 39(S1): 471-477.
|
[13] |
LONG Xi′an.
Integrated Design Scheme for Underground Station and Urban Complex: a Case Study of Integrated Construction of Meiqi Station on Foshan Line No. 3 and Vanke Sky City Project
[J]. Tunnel Construction, 2019, 39(8): 1341-1349.
|
[14] |
JIANG Yusheng, SUN Zhengyang, YANG Zhiyong.
Construction Risk Monitoring System and Parameter Warning of EPB Shield
[J]. Tunnel Construction, 2019, 39(7): 1083-1089.
|
[15] |
LIU Li, GAO Xincai.
Bearing Capacity Calculation of Concretefilled Steel Tubular Column during Construction of Metro Station by PBA Method
[J]. Tunnel Construction, 2019, 39(7): 1152-1157.
|