ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2012, Vol. 32 ›› Issue (增刊2): 101-104.DOI: 10.3973/j.issn.1672-741X.2012.z2.020
Previous Articles Next Articles
DONG Xiangkuan
Received:
Revised:
Online:
Published:
Abstract:
Muck conditioning, tunneling parameters control of composite TBM, temperature of cooling water for cutterhead and project geological condition are analyzed in this paper, in the interest of solving mud cake in cutterhead during composite TBM tunneling in urban metro. Then, a compositive system for ensuing smoothly TBM tunnellling without mud cake or with little mud cake is proposed, including muck conditioning, tunneling parameters adjustment of composite TBM and cooler circulated cooling water.
Key words: composite TBM, sandy mudstone, causes for mud cake in cutterhead, precautionary measures
DONG Xiangkuan. Mud Cake Prevention Technology for Composite TBM Tunneling in Chongqing[J]. Tunnel Construction, 2012, 32(增刊2): 101-104.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2012.z2.020
http://www.suidaojs.com/EN/Y2012/V32/I增刊2/101