Abstract:
To solve the problem of the need for intensified piles during construction measurement of two isolated and viewblock control position, the layout condition, layout method, calculation method and merit and demerit of nonoriented traverse and several matters need attention in the application nonoriented traverse are analyzed and presented.
Key words: nonoriented traverse, calculation method, merit and demerit
LUO Qing. Study on the Application of Nonoriented Traverse in Intensified Control Net[J]. Tunnel Construction, 2012, 32(增刊2): 205-209.