[1] |
HUANG Zhangjun, YANG Yanling, TANG Dongsang, ZHANG Weizhong.
Numerical Simulation and Monitoring of Reaction Wall
of Launching Shaft for Large Rectangular Pipe Jacking
[J]. Tunnel Construction, 2020, 40(7): 972-980.
|
[2] |
HAN Yun.
Study on Treatment Technology of Water Gushing and Mud
Bursting Caused by Segment Drilling of Underwater Shield Tunnel
[J]. Tunnel Construction, 2020, 40(7): 1049-1056.
|
[3] |
LI Zhijun, GUO Xinxin, MA Zhenwang, YANG Tielun, XU Jianqiang.
Research Status and Highstrength
Prestressed Primary (type)
[J]. Tunnel Construction, 2020, 40(6): 769-782.
|
[4] |
CHEN Ziquan, KOU Hao, YANG Wenbo, HE Chuan, LI Yonglin.
Cases Analysis of Mechanical Behavior Characteristics
of Tunnel Supporting Structure in Mountainous Areas in
Southwest China
[J]. Tunnel Construction, 2020, 40(6): 800-812.
|
[5] |
ZHANG Yazhou.
Numerical Simulation on Waterproof Capacity of Shield Tunnel
Joints Considering Working State of Sealing Gasket Surface
[J]. Tunnel Construction, 2020, 40(6): 813-820.
|
[6] |
ZHANG Zhenhua, BAI Yonghou, GUO Chun, CHENG Jianghao.
Noise Propagation Characteristics of Tunnel
Construction by
Drilling and Blasting Method
[J]. Tunnel Construction, 2020, 40(6): 821-826.
|
[7] |
ZHOU Peng, GAO Jincang, LI Lei, ZHENG Fei, DAI Yong.
Temporal and Spatial Characteristics of Large Deformation of Unsymmetrically-pressured Loess Tunnel Passing through Scarp Terrain
[J]. Tunnel Construction, 2020, 40(5): 652-659.
|
[8] |
WU Fengbo, JIN Huai, YANG Qiyan, ZHENG Weiqiang.
Analysis of Ground Transverse Settlement Groove Parameters of Beijing Metro Tunnel
[J]. Tunnel Construction, 2020, 40(5): 660-671.
|
[9] |
ZHANG Yu, YANG Junsheng, ZHU Zhiheng, TANG Zhiyang, FU Jinyang.
Study and Application of Global Deformation Monitoring Technology of Tunnel Primary Support Based on Image Point Cloud Space Distance Measurement Algorithm
[J]. Tunnel Construction, 2020, 40(5): 686-694.
|
[10] |
LUO Wenjing, ZOU Chenglu.
Key Technologies and Numerical Analysis of Metro Station by Cut-and-cover and Mining Method at Semi-diagenetic Stratum in Nanning
[J]. Tunnel Construction, 2020, 40(5): 727-734.
|
[11] |
ZHOU Guangping.
Deformation Characteristics of Lining Structure of Long-and-Large Open-cut
Donghuayuan Tunnel on Beijing-Zhangjiakou High-speed Railway
[J]. Tunnel Construction, 2020, 40(3): 316-325.
|
[12] |
QIN Jiajia.
Study on Parameters Control of Shield Tunneling
in Composite Strata in Hefei Area
[J]. Tunnel Construction, 2020, 40(3): 435-443.
|
[13] |
HAN Xianmin, XIAO Mingqing, LI Wenjiang, ZHU Yongquan.
Influence of Multipipe Jacking of Pipe CurtainStructure Method on Settlement of Platform and Track of Railway Station
[J]. Tunnel Construction, 2020, 40(2): 170-178.
|
[14] |
JIN wei, TIAN Yuan, YAN Zihai, WANG Mingnian.
Study on Safety of Underground Combined Structures under Different Fire Scales
[J]. Tunnel Construction, 2020, 40(2): 215-222.
|
[15] |
ZHANG Wenjun, DING Chao, ZHANG Gaole, WANG Yi, SHANGGUAN Dandan, JIANG Kun.
Type Selection and Design of Composite Sealing Gasket for Segment Joints of Shield Tunnel
[J]. Tunnel Construction, 2020, 40(2): 246-255.
|