ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2013, Vol. 33 ›› Issue (4): 287-294.DOI: 10.3973/j.issn.1672-741X.2013.04.006
Previous Articles Next Articles
ZHANG Jinwei
Received:
Revised:
Online:
Published:
Abstract:
With the development of urban rail transit works, cases of transfer between new Metro station and existing Metro lines increase. As a result, easy and safe transfer becomes more and more important. The passenger flow under normal conditions and that in case of incidents are simulated by means of LEGION passenger simulation technology, so as to evaluate the transfer program. The evaluation results are then fed back to the design so as to make optimizations. The paper can provide reference for the design of similar projects in the future.
Key words: rail transit, transfer station, passenger simulation, existing Metro line
ZHANG Jinwei. Study on Design of Transfer between New Metro Station and Existing Metro Line Based on Passenger Simulation Technology[J]. Tunnel Construction, 2013, 33(4): 287-294.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2013.04.006
http://www.suidaojs.com/EN/Y2013/V33/I4/287
Research on Dynamic Benchmark Rate of Return of PPP Rail Transit Project