Muzhailing tunnel on LanzhouChongqing railway is a 19 kmlong twintube tunnel. Due to the high ground stress and the soft rock, large deformation occurs during the construction of the tunnel, which has great influence on the safety and successful construction of the tunnel. By drilling largediameter boreholes in advance to release the stress, the stress on the support structure is reduced, the deformation is brought under control and the support system becomes safe. In the paper, the construction and the effect of the largediameter boreholes are analyzed. Conclusions drawn are as follows: The largediameter boreholes drilled in advance can restrict the development of the deformation,but has some negative influence on the tunnel construction; The stress releasing effect and the construction organization of the largediameter boreholes should be further studied and improved.
Key words: Muzhailing tunnel, largediameter boreholes drilled in advance, high ground stress, soft rock, stress releasing
GAO Pan, ZHANG Wenxin, ZOU Chong. An Analysis on the Effect of Stress Releasing by Drilling in Advance Largediameter Boreholes: A Case Study on High Stress Field Soft Rock Tunnel[J]. Tunnel Construction, 2013, 33(10): 820-825.