Analysis on Behavior of Shieldbored Metro Tunnel Caused by Construction of Largescale Foundation Pit Located Above: Case Study on Foundation Pit of West Square Hangzhou East Railway Station

ZHANG Di   

  1. (Institute of Underground Engineering, China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063, Hubei, China)
  • Received:2013-05-27 Revised:2013-09-18 Online:2013-11-20 Published:2013-11-15

Abstract:

West Square of Hangzhou East Railway Station is a twostory largescale underground space developing project. With 10 m depth, the foundation pit is located above the running tunnel of Line 1 of Hangzhou Metro, with 673 m vertical clearance and 358 m influence length. In order to guarantee the safety of the operating Metro tunnel, layerbylayer and sectionbysection cutting of the foundation pit is simulated by FLAC 3D to evaluate the deformation and stress conditions of the Metro tunnel during foundation pit construction. It is concluded that layerbylayer and sectionbysection cutting of the foundation pit will not cause damage to the Metro tunnel. Furthermore, requirements for the monitoring of the Metro tunnel is proposed. The monitoring results show that layerbylayer and sectionbysection cutting of the foundation pit can guarantee the safe operation of the Metro tunnel. 

Key words: largescale foundation pit cutting, shieldbored Metro tunnel, FLAC 3D