ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2014, Vol. 34 ›› Issue (1): 53-59.DOI: 10.3973/j.issn.1672-741X.2014.01.009

Previous Articles     Next Articles

New Technologies Applied in Design and Construction of Shanghai Metro Works

BAI Tinghui   

  1. (Shanghai Shentong Metro Co., Ltd., Shanghai 200031, China)
  • Received:2013-07-13 Revised:2013-11-20 Online:2014-01-20 Published:2014-01-21

Abstract:

Problems such as great construction difficulties, high risks, tight construction schedules, numerous existing line crossings and strict surrounding environment requirements are encountered in the construction of the New 5 Lines of Shanghai Metro. Solutions for these problems are presented, with the Metro station deep foundation pits, shield boring across underneath existing Metro lines, and the passenger transfer tunnels and entrance/exist tunnels as example. The concept of “construction serves for the operation” is promoted. 

Key words: Shanghai Metro, deep foundation pit, shield tunneling, passenger transfer tunnel