ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2014, Vol. 34 ›› Issue (1): 53-59.DOI: 10.3973/j.issn.1672-741X.2014.01.009
Previous Articles Next Articles
BAI Tinghui
Received:
Revised:
Online:
Published:
Abstract:
Problems such as great construction difficulties, high risks, tight construction schedules, numerous existing line crossings and strict surrounding environment requirements are encountered in the construction of the New 5 Lines of Shanghai Metro. Solutions for these problems are presented, with the Metro station deep foundation pits, shield boring across underneath existing Metro lines, and the passenger transfer tunnels and entrance/exist tunnels as example. The concept of “construction serves for the operation” is promoted.
Key words: Shanghai Metro, deep foundation pit, shield tunneling, passenger transfer tunnel
BAI Tinghui. New Technologies Applied in Design and Construction of Shanghai Metro Works[J]. Tunnel Construction, 2014, 34(1): 53-59.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2014.01.009
http://www.suidaojs.com/EN/Y2014/V34/I1/53