Abstract:
It is a new topic to build longdistance inclined shafts of coal mines by shield/TBM, which has great significance in shortening the construction period and reducing the construction cost. In this paper, comparison and contrast is made between the conventional mining method and the shield/TBM method in terms of technical indexes and economic indexes, the prospectives of the application of shield/TBM in the construction of longdistance inclined shafts of coal mines are analyzed, and the stateofart of the application of shield/TBM in the construction of inclined shafts is presented. The challenges in the construction of longdistance inclined shafts by shield/TBM are analyzed in terms of selection of proper types of shield/TBM, adaptability of shield/TBM selected, design of inclined shaft lining structure, and construction under complex environment. The results of researches made recently, including the development of dualmode shield/TBM equipment, the establishment of a new type of inclined shaft lining structure, and technologies to cope with difficult conditions under complex environment, are summarized. Finally, problems to be further solved and the trend of studies on these problems are discussed.
Key words: shield /TBM, inclined shaft of coal mine, new type of shaft lining structure
HE Chuan. Challenges and Prospectives of Construction of Longdistance Inclined Shafts of Coal Mines by Shield/TBM[J]. Tunnel Construction, 2014, 34(4): 287-297.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2014.04.001
http://www.suidaojs.com/EN/Y2014/V34/I4/287