GAO Qiang, YU Wenlong
Received:
Revised:
Online:
Published:
Abstract:
In this article, the influence of the excavation of the foundation pit of Huanchengnanlu municipal tunnel on the existing underlying shieldbored tunnel on No. 2 line of Xi’an Metro is numerically simulated by means of FLAC3D finite differential software, and the antiuplifting of the existing Metro tunnel is calculated. The calculation and analysis result shows that: 1) The uplifting of the soil mass at the bottom of the foundation pit and the deformation of the existing Metro tunnel can be brought under effective control by using alternative, sectionbysection, layerbylayer and symmetrical excavation of the foundation pit and by consolidating the existing Metro tunnel by means of benchshaped piles. 2) The deformation and uplifting of the existing Metro tunnel is within the limits of related standards, and the safe operation of No. 2 line of Xi’an Metro can be guaranteed. Furthermore, automatic realtime monitoring is made for the existing Metro tunnel during the construction of the municipal tunnel and the monitoring result proves that the design of the construction of the municipal tunnel is reasonable and feasible.
Key words: foundation pit, Metro, shieldbored tunnel, overcrossing, numerical simulation, realtime monitoring
GAO Qiang, YU Wenlong. Analysis on Influence of Excavation of Foundation Pit of Municipal Tunnel on Existing Underlying Shieldbored Metro Tunnel[J]. Tunnel Construction, 2014, 34(4): 311-317.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/10.3973/j.issn.1672-741X.2014.04.004
http://www.suidaojs.com/EN/Y2014/V34/I4/311
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Noise Propagation Characteristics of Tunnel Construction by Drilling and Blasting Method